Incoming Material Release Assistant
Helps receiving and quality staff at a dietary supplement manufacturer decide whether an incoming lot can be released, must stay in quarantine, or should be rejected, based on 21 CFR Part 111 and a sample company specification.
Answer the questions in three steps. Step 2 changes depending on the type of material you choose in step 1. The assistant recommends a disposition; final release always requires quality control approval.
Use sample or redacted information only. Nothing you enter is saved or sent anywhere, and everything clears when you close or reset the page.
- 1Receipt
- 2Documents and testing
- 3Disposition
Step 1: Record the receipt
Describe the material as it arrived at the dock. All fields are required unless marked optional.
Step 2: Check documents and testing
Step 3: Recommended disposition
Why
Next steps
Sources and rules used
- 21 CFR Part 111, Current Good Manufacturing Practice for dietary supplements: §111.70(b) component specifications; §111.75(a)(1) identity testing of every lot of a dietary ingredient; §111.75(a)(2) relying on a COA only from a qualified supplier; §111.113 material review and disposition; §111.155 receiving, quarantine and lot identification of components; §111.160 receiving packaging and labels.
- Sample company component specification (fictional): COAs must name the specific lot; materials without a supplier expiration date receive a retest date 12 months from receipt; materials within 90 days of expiration are flagged for prompt use.
This tool supports, and does not replace, the judgment of qualified quality control personnel.